Layered, dimensional asphalt shingles.
Architectural shingles
Price level 1 of 4: $$$$Most affordable- Best for
- Traditional looks and the lowest cost up front
- Brands
- We install all major manufacturers of asphalt shingles
A straightforward exteriors company based in Maryville, Tennessee. Honest pricing, clear communication, and work done right.
Tap a service to see what we install, the options, and how to get a free quote.
We install architectural shingles, exposed-fastener and standing seam metal roofs, and DaVinci synthetic shake and slate. Our installers are certified and factory-trained.

Listed from most affordable to most high-end. Every roof is quoted on your house. Call, text or send the form for a free quote.
Layered, dimensional asphalt shingles.
Raised ribs, with screws through the flat of the panel.
Flat pans between raised seams. No exposed screws.
Synthetic tiles modeled on slate and hand-split cedar.
We work with several metal manufacturers to get the exact look of your project. The steel is American-made. Painted panels carry a Sherwin-Williams lifetime paint warranty, and other paint systems carry 40 years.

We install all major manufacturers of asphalt shingles, with certified, factory-trained installers.
Not sure it's time? Start with 10 signs you need a new roof.

When a storm or a falling tree damages your roof, call us. We document the damage with photos and can meet your insurance adjuster.
Every policy is different, so check yours. Our guide explains how a roof insurance claim works in Tennessee.
Office hours Monday to Friday, 9 AM to 5 PM. Storm and emergency calls answered outside office hours.






We install steel board-and-batten siding in solid colors, and wood prints that look like real boards. We also replace failing hardboard and Masonite siding.
Siding is quoted on your house. See it on a real home in our award-winning project.
Wide flat boards with narrow raised battens.
Barnwood, Cedar Natural, Primitive Pine and Cedar Gray.
Swollen, flaking hardboard laps.
Press your thumb into the bottom edge of a board near the ground. If it dents, flakes or feels spongy, the board has taken on water, and paint will not fix it. Read the full guide.



We're an authorized Alcoa Post Buildings dealer. Pick a model and we set it on your land. Every price below is installed, building shell only.

24 × 20 ft, 12 ft walls480 sq ft
Enclosed single-car garage. A compact garage for vehicle storage, a home workshop, lawn equipment, or recreational gear without taking up excessive space.

24 × 40 ft, 16 ft walls960 sq ft
Open-sided RV and equipment cover. Tall, open-sided covered storage for an RV, trailer, stacked hay, or farm equipment on properties that need versatile coverage without a fully enclosed building.

24 × 30 ft, 10 ft walls720 sq ft
Enclosed single-door garage. A practical garage with space for one large vehicle or two smaller vehicles, plus room for shelving, workbenches, and equipment.
A different size, more doors, a lean-to or a barndominium. We'll talk it through.
A lean-to is a roof that hangs off the side of a building, open or closed in. We add them to new buildings and to buildings you already have.
Every lean-to is custom-priced, especially on an existing structure, so we quote each one personally.
Tap to change the size. Every lean-to is custom-priced, so we'll quote yours.
24 ft long, 12 ft deep, open sides
We'll confirm the price after a quick look at your building.
Keep the tractor, mower and trailer out of the rain without building another barn.
Covered parking on the side of a shop or garage.
A shaded place to sit on the side of a building.
Firewood, hay and supplies, with the ends closed in if you like.
We set the building shell on your land and install the windows and exterior doors. You or your builder finish the inside. Every barndominium is quoted personally.
A low-maintenance alternative to wood and vinyl. Choose open rail or privacy, steel-wrapped wood posts or full steel posts, in black, white or a wood print.
Fence color
Open rail, for a ranch or farm look that keeps the view open.
Clean horizontal boards, closed for privacy or spaced for an open look.
Colors: black, white or a wood print. Drawings show standard sections; we quote your fence line personally.
Choose a metal or shingle roof, then pick roof and siding colors. The house changes as you tap.
Actual colors may vary. Final selection should be made from metal color chips. Painted panels carry a Sherwin-Williams lifetime paint warranty; other paint systems carry 40 years.

Metal Roofing Magazine, August/September 2026 edition
Our standing seam roof was featured as “Standing Seam Metal Roofing Delivers Timeless Performance on Tennessee Custom Home.”
A red standing seam roof with two cupolas and a dormer, over dark wood-print board-and-batten steel siding and black windows.

Straightforward from the first call.

Overland started in 2021 because there was a need for a straightforward construction company: honest pricing, clear communication, and work done right.
Since then we've completed over 800 jobs. Overland Exteriors was formerly Overland Construction & Roofing.
“Chris from Overland Construction is an honest man, and a great person to work with. Always taking each project as if it were his own home, Chris will make sure your new roof is left looking amazing. 10/10 Recommend.”
“I have known Chris for many years both personally and professionally. Overland is a great company that is there to serve. Chris is responsive, on time and always there to listen.”
“They are a great company and group of people to work with, from the initial sales person to the crew that performed the work, everyone included.”
Three short steps. Taps until the last one.
Most shingle roof replacements on an average East Tennessee home take one to two days. The crew protects your yard, tears off the old roof, repairs any bad decking, installs underlayment, flashing and new shingles, adds ridge caps and vents, then cleans up and walks the job with you. Expect noise, but you can usually stay home.
A little preparation the day before makes replacement day easier for everyone. Your roofer should confirm the date, the shingle and color, and where the materials and dumpster will go.
Materials are often delivered a day or two before the job. Shingles may be set on the roof by a boom truck to save time.

The crew usually starts early, sets up protection, and begins stripping the old roof. This is the loudest and messiest part of the day.
First comes protection. Tarps go over shrubs, flower beds and the ground along the walls, and plywood or tarps may lean against windows and AC units. A dumpster or trailer is placed close to the house.
Then the tear-off begins. Crews use flat shovels and roofing forks to pull up the old shingles, nails, underlayment and worn flashing, working one section at a time. Debris goes straight into the dumpster or onto the tarps. On most homes, the roof is stripped in sections so only part of the house is open at once, and anything opened is covered again the same day if weather threatens.
You will hear a lot of scraping and thumping. Most people stay home without trouble, though anyone who works from home may want headphones or a spot at the far end of the house.
With the old roof off, the crew checks the wood decking and replaces any boards that are soft, rotted or delaminated. This step is the reason a full tear-off is usually worth it.
The decking is the layer of plywood or OSB (oriented strand board, a panel made of compressed wood strands) that the roof is nailed to. Water that got past old shingles often softens it near chimneys, valleys, vents and eaves. Nobody can see that damage until the shingles come off.
A good roofer explains up front how decking repairs are handled and priced, and shows you the damaged wood before replacing it. Older homes sometimes have plank decking with gaps, which may need new sheathing laid over it so shingles have a solid base.
Before any shingles go on, the roof gets a water-resistant underlayment, metal drip edge and flashing. These layers do much of the real waterproofing work.
Shingles go on from the bottom of the roof up, starting with a starter strip along the eaves and rakes. Each row overlaps the one below so water always runs over a seam, never into it.
The installer nails each shingle in the zone the manufacturer marks on the shingle, using the number of nails the instructions call for. Correct nailing is one of the biggest factors in how well the roof resists wind, and it affects the manufacturer's warranty.
Valleys are finished according to the plan for your roof, either with shingles woven or cut across the valley or with an open metal valley. Around the top of the roof, the crew installs ridge vent if your house uses it, then caps the hips and ridges with special ridge-cap shingles.
Ventilation is checked along the way. A roof needs fresh air coming in low at the soffits and leaving high at the ridge or vents. Good airflow keeps the attic cooler in summer, reduces moisture in winter and helps the new shingles last.
Overland Exteriors installs all major manufacturers of asphalt shingles to the manufacturer's instructions, which is what keeps warranty coverage intact.
When the roof is done, the crew cleans up and walks the job with you. Do not sign off until you are comfortable with what you see.
Cleanup typically includes pulling the tarps, raking the beds, clearing gutters of debris and running a rolling magnet over the yard and driveway to pick up stray nails. Nails can scatter farther than you expect, so keep an eye out for a few days, especially near tires and bare feet.
During the walk-through, ask to see photos of any decking that was replaced, ask what shingle and color were installed, and ask how warranty registration works. Keep the paperwork with your house records. It helps if you sell, and it helps if you ever have a claim.
If you are still deciding what roof to put on, read architectural vs. 3-tab shingles or, if your roof is showing its age, 10 signs you need a new roof.
Weather drives the schedule here. Summer pop-up thunderstorms are common in the afternoon, so crews often start early, open only what they can cover the same day, and keep tarps ready. A job may be moved a day if heavy rain is forecast.
Summer heat also affects the work. Shingles soften in high heat and can scuff if walked on carelessly, and they seal down best once the sun warms them after installation. In colder months, shingles may take longer to seal, and some manufacturers call for hand-sealing in cool weather.
Many homes in Maryville, Alcoa and Knoxville have older decking that needs some repair once the roof is opened. Lake homes around Lenoir City and Loudon, and steep cabin roofs near Sevierville, may take extra time for safety setup and access. Overland Exteriors is based in Maryville and has completed over 800 jobs since 2021, so we plan for these details from the start. When you are ready, get a free quote.
Most average-size homes are finished in one to two days. Large, steep or complicated roofs, extensive decking repairs or rain delays can stretch that to several days.
Not necessarily, but someone should be reachable by phone in case the crew finds damaged decking or has a question. Many homeowners stay home, and being there for the final walk-through is a good idea.
Crews watch the forecast and open only what they can dry in the same day. Underlayment protects the deck from rain for a short time, and tarps cover anything that is still open. If heavy rain is coming, the job is usually rescheduled.
A careful crew covers beds and shrubs with tarps and keeps debris off the lawn as much as possible. Some trampling near the walls is hard to avoid. Point out anything delicate before work starts.
Old leaks, poor ventilation and age can rot or soften the plywood or OSB under your shingles. Shingles need a solid base to stay nailed down, so soft spots are replaced before the new roof goes on.
It is a kind gesture. Tear-off is loud, and trucks and a dumpster may be on the street for a day or two.