Call or text865-995-6166 Call or text865-995-6166

Roofing and siding, done right.

A straightforward exteriors company based in Maryville, Tennessee. Honest pricing, clear communication, and work done right.

See my house in color
  • Since 2021, over 800 jobs completed
  • Certified, factory-trained installers
  • Local, family-owned and fully insured

What can we help with?

Tap a service to see what we install, the options, and how to get a free quote.

Metal and shingle roofs, done right

We install architectural shingles, exposed-fastener and standing seam metal roofs, and DaVinci synthetic shake and slate. Our installers are certified and factory-trained.

Every major brand
of architectural shingles installed
Factory-trained
certified installers
Lifetime
Sherwin-Williams paint warranty on painted metal
Try roof colors
Black standing seam metal roof on a navy blue home, seen from above
Black standing seam metal roof on a navy blue home, seen from above

Four roofs we install

Listed from most affordable to most high-end. Every roof is quoted on your house. Call, text or send the form for a free quote.

Layered, dimensional asphalt shingles.

Architectural shingles
Price level 1 of 4: Most affordable
Best for
Traditional looks and the lowest cost up front
Brands
We install all major manufacturers of asphalt shingles

Raised ribs, with screws through the flat of the panel.

Exposed-fastener rib panel
Price level 2 of 4: Mid-range
Best for
Barns, shops, cabins and budget-minded homes
Fasteners
Screwed through the panel face with sealing washers
Paint
Sherwin-Williams lifetime paint warranty on painted panels

Flat pans between raised seams. No exposed screws.

Standing seam metal
Price level 3 of 4: High-end
Best for
Homes you plan to keep, and a clean modern look
Fasteners
Hidden under the seams
Paint
Sherwin-Williams lifetime paint warranty on painted panels

Synthetic tiles modeled on slate and hand-split cedar.

DaVinci shake and slate
Price level 4 of 4: Ultra-high-end
Best for
The look of cedar shake or natural slate, without the upkeep
Profiles
Shake and slate, in many colors and blends
Pricing
Quoted on your roof

We work with several metal manufacturers to get the exact look of your project. The steel is American-made. Painted panels carry a Sherwin-Williams lifetime paint warranty, and other paint systems carry 40 years.

Charcoal architectural shingles on a large colonial home, seen from above
Charcoal architectural shingles on a large colonial home, seen from above

Shingle roofs from every major manufacturer

We install all major manufacturers of asphalt shingles, with certified, factory-trained installers.

Not sure it's time? Start with 10 signs you need a new roof.

Our crew working a roof where a large tree came down
Our crew working a roof where a large tree came down

Storm or tree damage?

When a storm or a falling tree damages your roof, call us. We document the damage with photos and can meet your insurance adjuster.

Every policy is different, so check yours. Our guide explains how a roof insurance claim works in Tennessee.

Office hours Monday to Friday, 9 AM to 5 PM. Storm and emergency calls answered outside office hours.

Call or text 865-995-6166

A few of our roofs

See the full roofing page

Steel siding in solid colors and wood prints

We install steel board-and-batten siding in solid colors, and wood prints that look like real boards. We also replace failing hardboard and Masonite siding.

Board and batten
steel, in colors from the full chart
11 wood prints
from Barnwood to Primitive Pine
Lifetime
Sherwin-Williams paint warranty on painted panels
See my house in color
Steel board-and-batten in the Barnwood wood print

What we put on your walls

Siding is quoted on your house. See it on a real home in our award-winning project.

Wide flat boards with narrow raised battens.

Steel board-and-batten
Best for
Farmhouse, cabin and modern looks
Colors
Solid colors from the full chart
Paint
Sherwin-Williams lifetime paint warranty on painted panels

Barnwood, Cedar Natural, Primitive Pine and Cedar Gray.

Wood-print steel
Best for
The look of stained wood boards
Finishes
11 wood prints on the chart
Fade warranty
20 years on wood-print coatings

Swollen, flaking hardboard laps.

Hardboard replacement
Best for
Soft, swelling or flaking hardboard and Masonite
What we do
Old siding off, steel siding on
Check yours
The thumb test below
The thumb test for hardboard

Press your thumb into the bottom edge of a board near the ground. If it dents, flakes or feels spongy, the board has taken on water, and paint will not fix it. Read the full guide.

A few of our siding jobs

See the full siding page

Metal buildings and pole barns, installed on your land

We're an authorized Alcoa Post Buildings dealer. Pick a model and we set it on your land. Every price below is installed, building shell only.

Authorized Alcoa Post Buildings dealer

  • The Riverbend, 24 by 20 ft
    Enclosed, with doors
    The Riverbend

    24 × 20 ft, 12 ft walls480 sq ft

    Enclosed single-car garage. A compact garage for vehicle storage, a home workshop, lawn equipment, or recreational gear without taking up excessive space.

    Installed on your land$19,900Building shell only. Site work and concrete not included.
    What's included
    • Engineered steel trusses
    • 40-year warranty painted roof and wall metal
    • 6×6 treated posts
    • Complete trim package
    • 2×6 roof purlins
    • Alcoa Thermal Shield roof insulation
    • 2×6 wall girts
    • Above-ground post foundation with steel brackets
    • Screws and fastening hardware
    • 12×10 framed garage opening
    • 3 ft white steel walk door
    • (2) 3×4 white non-grid windows
    • 1.5 ft enclosed roof overhangs
  • The Trailside, 24 by 40 ft
    Open building
    The Trailside

    24 × 40 ft, 16 ft walls960 sq ft

    Open-sided RV and equipment cover. Tall, open-sided covered storage for an RV, trailer, stacked hay, or farm equipment on properties that need versatile coverage without a fully enclosed building.

    Installed on your land$16,900Building shell only. Site work and concrete not included.
    What's included
    • Engineered steel trusses
    • 30-year Galvalume roof and wall metal
    • Complete trim package
    • 2×6 roof purlins
    • 2×6 wall girts
    • Embedded 6×6 treated post foundation system
    • Screws and fastening hardware
    • 1.5 ft roof overhangs
  • The Smoky Ridge, 24 by 30 ft
    Enclosed, with doors
    The Smoky Ridge

    24 × 30 ft, 10 ft walls720 sq ft

    Enclosed single-door garage. A practical garage with space for one large vehicle or two smaller vehicles, plus room for shelving, workbenches, and equipment.

    Installed on your land$20,889Building shell only. Site work and concrete not included.
    What's included
    • Engineered steel trusses
    • 40-year warranty painted roof and wall metal
    • 6×6 treated posts
    • Complete trim package
    • 2×6 roof purlins
    • Alcoa Thermal Shield roof insulation
    • 2×6 wall girts
    • Above-ground post foundation with steel brackets
    • Screws and fastening hardware
    • 9×8 framed garage opening
    • 3 ft white steel walk door
    • 1.5 ft enclosed roof overhangs

Want something custom? Give us a call.

A different size, more doors, a lean-to or a barndominium. We'll talk it through.

865-995-6166

Lean-tos: covered space on the side of a building

A lean-to is a roof that hangs off the side of a building, open or closed in. We add them to new buildings and to buildings you already have.

Every lean-to is custom-priced, especially on an existing structure, so we quote each one personally.

New or existing
building, ours or one you have
Open or closed
sides, your choice
Custom-priced
call or send the form
Call or text 865-995-6166
The lean-toYour building

Pick your lean-to size

Tap to change the size. Every lean-to is custom-priced, so we'll quote yours.

Length
24 ft
Depth
12 ft
Sides

24 ft long, 12 ft deep, open sides

We'll confirm the price after a quick look at your building.

How people use them

Equipment cover

Keep the tractor, mower and trailer out of the rain without building another barn.

Carports

Covered parking on the side of a shop or garage.

Porches and patios

A shaded place to sit on the side of a building.

Storage

Firewood, hay and supplies, with the ends closed in if you like.

See the full lean-tos page

Barndominium shells, set on your property

We set the building shell on your land and install the windows and exterior doors. You or your builder finish the inside. Every barndominium is quoted personally.

The shell
set on your property
Windows and doors
exterior, installed
Quoted personally
bring your size or plans
Call or text 865-995-6166

What the shell includes

  • The building shell, set on your property
  • Windows, installed
  • Exterior doors, installed

Not included

  • Garage doors
  • Finishing the inside, which you or your builder handle

See the full barndominiums page

Steel fencing in two styles

A low-maintenance alternative to wood and vinyl. Choose open rail or privacy, steel-wrapped wood posts or full steel posts, in black, white or a wood print.

Call or text 865-995-6166

Fence color

8 ft section4 ft
RidgeLine

Open rail, for a ranch or farm look that keeps the view open.

Style
Open rail
Section
4 ft high by 8 ft wide, standard
Posts
Steel-wrapped wood, or full steel with a hat channel
Gauge
26 standard, 24 optional
6 ft section6 ft6 ft section6 ft
TimberLine

Clean horizontal boards, closed for privacy or spaced for an open look.

Style
Privacy or open
Section
6 ft high by 6 ft wide
Top
Steel hat purlin included
Posts
Steel-wrapped wood, or full steel
Gauge
26 standard, 24 optional

Colors: black, white or a wood print. Drawings show standard sections; we quote your fence line personally.

See the full fencing page

See your house in color

Choose a metal or shingle roof, then pick roof and siding colors. The house changes as you tap.

Roof color

Selected: Charcoal

Siding color

Selected: Light Stone

Try a combo

Actual colors may vary. Final selection should be made from metal color chips. Painted panels carry a Sherwin-Williams lifetime paint warranty; other paint systems carry 40 years.

The award-winning home: a red standing seam roof with two cupolas and a dormer over dark wood-print board-and-batten steel siding

Project of the Month

Metal Roofing Magazine, August/September 2026 edition

Our standing seam roof was featured as “Standing Seam Metal Roofing Delivers Timeless Performance on Tennessee Custom Home.”

A red standing seam roof with two cupolas and a dormer, over dark wood-print board-and-batten steel siding and black windows.

Read the article (opens in a new tab)

Straightforward construction since 2021

  • 2021Doing this work since 2021
  • 800+Jobs completed
  • Factory-trainedCertified installers
  • Fully insuredLocal and family-owned, based in Maryville
  • LifetimeSherwin-Williams paint warranty on painted panels
Standing seam metal roof going on above a backyard pool
Standing seam metal roof going on above a backyard pool

How a job runs

Straightforward from the first call.

  1. Call, text or send the formPhotos help. You can add them to the quote form.
  2. We look at the projectWe talk through what you need and the options that fit.
  3. You get a free quoteHonest pricing, so you can decide on your own time.
  4. We do the workDone right, with clear communication along the way.
White Hardie board siding on a new farmhouse build
White Hardie board siding on a new farmhouse build

Our story

Overland started in 2021 because there was a need for a straightforward construction company: honest pricing, clear communication, and work done right.

Since then we've completed over 800 jobs. Overland Exteriors was formerly Overland Construction & Roofing.

  • Based in Maryville, Tennessee
  • Local and family-owned
  • Fully insured
  • Certified, factory-trained installers
  • Monday to Friday, 9 AM to 5 PM
  • Authorized Alcoa Post Buildings dealer

“Chris from Overland Construction is an honest man, and a great person to work with. Always taking each project as if it were his own home, Chris will make sure your new roof is left looking amazing. 10/10 Recommend.”

Alex OlacheaCustomer

“I have known Chris for many years both personally and professionally. Overland is a great company that is there to serve. Chris is responsive, on time and always there to listen.”

Stephen BeechCustomer

“They are a great company and group of people to work with, from the initial sales person to the crew that performed the work, everyone included.”

Juan Francisco OliveiraCustomer

Get your free quote

Three short steps. Taps until the last one.

  • Rather talk? Call or text 865-995-6166
  • Send us a few photos with the form
  • Monday to Friday, 9 AM to 5 PM

Step 1 of 3

What are we looking at?

Tap one. You can change it later.

Rather talk? Call or text 865-995-6166

How to Prepare Your Site Before a Metal Building Goes Up

Quick answer

Before a metal building goes up, confirm permits and setbacks, have underground utilities marked, clear trees and brush, then grade a level, well-drained pad a few feet larger than the building. Add compacted gravel or concrete as your model requires, and make sure a truck can reach the site. In East Tennessee, drainage is the step people most often underestimate.

Key takeaways

  • Start with permits, setbacks and utility locates before anyone touches the ground.
  • The building pad should be level, compacted and a few feet larger than the building on every side.
  • Water must drain away from the building, which matters a great deal on East Tennessee clay.
  • Whether you need concrete footings, a slab or gravel depends on the building model and how you will use it.
  • Leave clear, firm access for delivery trucks and a staging area for materials.

Why site prep matters

A building is only as square, level and dry as the ground it sits on. Good site prep keeps doors working, water out and the frame sitting true for decades.

Site work is also usually the owner's responsibility. Our catalog building prices are installed on your land, building shell only; site work and concrete not included. Knowing what to prepare, and in what order, saves time and avoids a crew showing up to a site that is not ready.

Step 1: Check permits, setbacks and location

Call your county or city building office before you pick the final spot. Permit rules, property-line setbacks and use restrictions vary a lot across Tennessee.

  • Permits. Ask whether your building needs a permit and what drawings they want. The manufacturer provides assembly drawings for each kit, and your local office will tell you what else is required.
  • Setbacks. Most areas require buildings to sit a set distance from property lines, roads and sometimes streams or lakes.
  • Restrictions. Subdivisions and HOAs may limit size, height, color or whether metal buildings are allowed at all.
  • Septic and well. Keep the building, its pad and any truck traffic well clear of septic tanks, drain fields and well heads.
  • Floodplain. If any part of your land is near a creek or low area, ask whether it is in a flood zone.

If the building will become a home, the rules are different again. Our guide to planning a barndominium in Tennessee covers residential permits and prep.

Step 2: Call 811 and plan your utilities

Call 811 a few business days before any digging to have underground power, gas, water and communication lines marked. It is free and it is the law in Tennessee before you dig.

This is also the time to plan any utilities the building will need. If you want electricity, decide where the line will come in and whether it will run underground. Conduit for power and any water lines should be placed before a concrete slab is poured, since adding them afterward means cutting concrete. Think about where outlets, lights and a future workbench will go.

Step 3: Clear and grade a level pad

Remove trees, stumps, roots and topsoil from the building area, then grade a level, compacted pad. Make the pad a few feet larger than the building on every side.

Clearing

Stumps and large roots should come out completely. Buried wood rots and leaves soft spots that settle over time. Topsoil and organic material should be stripped, because it compresses and holds water.

Grading

The finished pad needs to be level for the building itself, with the surrounding ground sloping away so water drains off. On a hillside, that may mean cutting into the slope on one side and filling on the other. Fill should be placed in layers and compacted, since loose fill will settle.

Pad size

Extending the pad beyond the walls gives the crew room to stand, set ladders and work, and keeps rainwater dripping off the roof edge from washing out the ground at the base.

Tip: Visit the site during or right after a hard rain before you finalize the spot. Watching where water actually runs tells you more than any map.

Step 4: Plan for drainage

Water should move away from the building on every side. Poor drainage is the most common cause of soft floors, washed-out pads and wet interiors.

  • Slope the surrounding ground away from the pad.
  • Do not set the building in a low spot where runoff collects.
  • On a slope, consider a shallow swale or ditch on the uphill side to send water around the building.
  • Plan where roof water will go, especially if you add gutters. A metal roof sheds a lot of water quickly in a heavy storm.

Step 5: Gravel, concrete footings or a slab

What goes on the pad depends on your building model and how you will use the floor. Post-frame buildings can stand on embedded posts or on posts mounted to concrete, and the floor can be gravel or a slab. Our comparison of post-frame vs. steel-frame buildings explains how each frame type meets the ground.

For Alcoa Post Buildings models, which Overland sells and installs as an authorized dealer, the foundation varies by model. Some use traditional embedded posts as standard, while others use above-ground brackets mounted to concrete, which keep the treated posts off the ground. Ask which applies to your model before you plan the concrete.

OptionGood forThings to know
Compacted gravel floorHay, implements, firewood, general storageLower upfront cost, drains well, can be upgraded to concrete later
Concrete slabVehicles, workshops, anything you roll or sweepPlace conduit and plumbing first, and let it cure before heavy use
Concrete footings or pads at postsModels with bracket-mounted postsPlacement must match the building layout exactly

If you pour concrete before the building goes up, the slab and any footings must match the building's exact dimensions and post layout. Coordinate the drawings with your concrete contractor before the pour.

Step 6: Make room for trucks and materials

The delivery truck and crew need a firm path to the site and a flat area to unload. If a loaded truck cannot reach the pad, the job stalls.

  • Check the driveway for low branches, tight turns, soft ground and weight-limited culverts or bridges.
  • Clear a flat staging area near the pad for trusses, posts, lumber and panels.
  • Mow the area around the site so dropped fasteners are easy to find.
  • Think about future add-ons. If you may want a lean-to later, keep that side of the pad clear and graded.
  • After heavy rain, wet fields may need a few dry days before a truck can drive on them.

Once the site is ready, you can review the models and installed prices on our buildings page and in our guide to what a pole barn costs installed.

What this means in East Tennessee

Red clay is the big local challenge. It drains slowly, turns slick after rain and can heave a little through freeze and thaw cycles. Around Maryville, Alcoa and Knoxville, a well-compacted gravel base and careful grading away from the building make a real difference. Sloped and wooded lots near Sevierville and the foothills often need more clearing and cut-and-fill work than people expect.

Spring is the wettest stretch of the year here, which can push back grading and concrete pours. Late summer and fall are often the easiest seasons for site work. Lake properties around Lenoir City and Loudon may also have shoreline rules worth checking before you choose a location.

Questions people ask

How level does the site need to be?

The building pad itself should be level and compacted, with the surrounding ground sloping gently away for drainage. Exact tolerances depend on the building and foundation type, so confirm with your installer before grading is finished.

Should I pour the concrete before or after the building goes up?

Either can work. Pouring first gives a clean, level floor to build on but requires the slab to match the building layout exactly. Pouring later lets you start with gravel and add concrete when you are ready.

Is site work included in the building price?

No. Catalog buildings are priced installed on your land, building shell only; site work and concrete not included. Plan to hire an excavation contractor for clearing and grading and a concrete contractor if you want a slab.

How long should new concrete cure before the building goes up?

It depends on the mix, the weather and the loads involved, so ask your concrete contractor. Concrete keeps gaining strength for weeks after the pour, and cool or wet weather slows curing. Plan a gap between the pour and install day rather than scheduling them back to back.

Do I really need to call 811 before digging?

Yes. Calling 811 is free, required in Tennessee before digging, and protects you from hitting buried power, gas or water lines. Call a few business days before any digging starts.

Can a metal building go on a sloped lot?

Yes, as long as the pad is graded level and water is directed around the building. Steeper lots need more cut-and-fill work, which adds to site prep cost.